Aldi, Caerphilly - Construction (Retail)
Contract consisted of providing all Civil Engineering and Ground Works to facilitate the construction of a new 12,500 square foot shop unit.
Alton Business Park, Ross on Wye - Construction (Industrial)
The construction of new office and industrial units set amid some of England’s most beautiful countryside.
Alton House, Ross on Wye - Construction (Commercial)
The construction of new office and industrial units set amid some of England’s most beautiful countryside.
Arbour Hill Farm, Ross-on-Wye - Civil Engineering
Construction of a new vehicular access and driveway.
Bishopswood House, Ross on Wye - Property Services
A project which involved the restoration of a large country house.
Bishopswood Units, Ross on Wye - Property Services
These new homes were created from the kitchen, gun room, snooker room and servants bedrooms which were part of Bishopswood House.
Bridgend - Construction (Industrial)
Construction of internal full height partitions including all necessary fire protection to the structural steelwork.
C.J.C.L.D.S, Cardiff - Civil Engineering (Infastructure)
Construction of additional car parking in tarmac, block paving and grass etc. Including new drainage and landscaping.
Club Ginger, Lydney - Construction (Leisure)
This project involved the refurbishment of a retail unit to create a new gymnasium for a new leisure company called Club Ginger.
Everstone Barns, Peterstow - Construction (Residential)
A development of six barn conversions. This development included a mixture of modern and traditional designs.
Forest View Industrial Estate, Cinderford - Construction (Industrial)
A new fuel depot constructed for Texaco / Owen Fuels.
Greencoat, Monmouth - Construction (Industrial)
Construction of a new industrial unit of circa 2500m2 including two storey office space, specialised wash down clean rooms and laboratory facilities.
GlaxoSmithKline, Coleford - Civil Engineering (Infastructure)
Improvement works to sections of the existing road prior to commencement of Project Everest. Including excavation to designed depths, structural backfill and laying of in-situ structural concrete slabs.
Hereford Retail Park, Hereford - Construction (Retail)
This project involved the demolition of existing buildings and the construction of a new retail development.
Hildersley, Ross-on-Wye - Construction (Residential)
This was a one off, individually designed new build, to suit the site conditions.
Horn Hill Cottage, Drybrook - Construction (Residential)
Conversion of a stone cottage and outbuilding into a 2,600ft² luxury farmhouse.
Kingsditch Trading Estate, Cheltenham - Civil Engineering (Infastructure)
Resurfacing works to existing car parking and drainage repairs.
Library Mews, Ross-on-Wye - Construction (Residential)
A town centre development of 9 new build homes carefully designed and constructed to replace a primary school.
Longhope House, Longhope - Construction (Residential)
A new build, one off bespoke house. This house was individually designed to suit the site it was built on.
Market Street, Ledbury - Construction (Residential)
A terrace of 7 new 3 bedroom homes.
Mill Pond Street, Ross-on-Wye - Construction (Residential)
A development of five apartments on the site of a former Brewery.
Mill Race, Ross-on-Wye - Construction (Leisure)
This project involved the redevelopment and extension of a small village pub.
Mitcheldean - Construction (Residential)
Installation of precast concrete box culvert for storm water attenuation in line with drainage authority.
Paragon, Ross-on-Wye - Construction (Industrial)
A new 20,000 square foot laundry facility with associated offices and retail counter.
Park Farm, Ruardean - Construction (Residential)
The redevelopment of a redundant farm yard in the village centre.
Sennybridge - Civil Engineering (Land Remediation)
Formally a FMD site, MF Freeman was contracted by DEFRA to reinstate the former runway to enable re-use as a short landing strip.
St Josephs, Ross-on-Wye - Construction (Residential)
A development of four newly constructed lavish apartments and a conversion of existing buildings into two bungalows and a two storey terraced house.
St. Mary’s Close, Madley - Construction (Residential)
A development of 8 new build properties neatly tucked into the grounds of a single house in a village location.
Sunnyside, Howle Hill - Construction (Residential)
The sympathetic conversion and extension of an existing cottage.
Tarmac Concrete Plant, Stowfield - Civil Engineering (Infastructure)
Construction of all necessary bases and associated ramps, service connections and surfacing operations to construct a completely new bespoke concreting plant for Tarmac Ltd.
Tarmac Washplant, Stowfield - Civil Engineering (Infastructure)
Construction of all civils works to enable assembly of the new stone washing facility at Stowfield Quarry.
Throckmorton - Civil Engineering (Land Remediation)
Throckmorton was the first FMD site to be undertaken by MF Freeman for DEFRA.
Unit 12, Newent Business Park - Construction (Commercial)
A new two storey office building, 4,800 square feet on two levels and split into three separate units.
Unit 8, Newent Business Park - Construction (Industrial)
A 20,000 square foot industrial building with associated offices.
Wellmeadow, Staunton - Construction (Residential)
A new housing development of three four bedroom properties.
Woodford Halse, Daventry - Construction (Industrial)
MF Freeman have recently completed construction of this new commercial development in Woodford Halse, Daventry.
